Pepperell Planning Board backs construction manager for vacant board seat

PEPPERELL — January 17, 2023 — Pepperell Planning Board unanimously recommends construction professional Brooke Rampond to fill its vacant seat. The board voted 4-0 at its January 17 meeting to advance Rampond's application to a joint appointment meeting with the Select Board on January 23 at 6:50 p.m. Rampond, of 5 Countryside Road, has nearly 20 years in construction and currently manages projects at Harvard Business School as an owner's representative for Burlington-based consulting firm CSL. The board also continued its as-built review of 1-6 Scotch Pine Farm Way to February 6, citing unresolved questions about the engineer's certification method for underground drain locations, stormwater capacity for two enlarged building footprints, and whether the fire truck turnaround — reconfigured in December — can be verified by an actual vehicle test. Building Commissioner Bentley Hargett noted that roof drain locations have never been independently confirmed, leaving future homeowners with no reliable maintenance reference.

Keep reading with a 14-day free trial

Subscribe to The Pepperell MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Pepperell MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Reading Post · The Sherborn Post · The Shirley Post · The Somerville Post · The Stoneham Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.