Pepperell Conservation Commission clears riverfront line for Laden Street 40B project

PEPPERELL — January 6, 2026 — Pepperell Conservation Commission reaches agreement on contested riverfront boundary for a 40B apartment complex and advances a Cranberry Street driveway plan with sharply reduced wetland fill. The commission informally accepted a riverfront area determination for the Mass AV Rentals LLC project at 59 Laden Street and Lowell Road — a five-building, 40B complex whose wetland resource boundaries have been under review — after Brian Melissi of Haley Ward presented a FEMA flood map overlay establishing the mean annual high water line of Reading Meadow Brook. On a separate single-family driveway project at 14 Cranberry Street, the board signaled support for a retaining wall alternative that reduces wetland fill from approximately 2,400 square feet to 800 square feet, cutting the impact by about two-thirds. Both hearings were continued to February 3, the first meeting under the commission's new 6 p.m. start time. The commission also unanimously issued a Certificate of Compliance for 181A South Road and heard that the Trueblood Street dam removal site is stabilizing under additional DEP monitoring conditions.

Keep reading with a 14-day free trial

Subscribe to The Pepperell MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Pepperell MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Reading Post · The Sherborn Post · The Shirley Post · The Somerville Post · The Stoneham Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.