Pepperell Conservation Commission unanimously approves order of conditions for Hollis Street condos

PEPPERELL — October 20, 2020 — Pepperell Conservation Commission clears three-unit Hollis Street condo project after 13-year delay. The commission voted unanimously Tuesday to issue an order of conditions for New View Remodeling and Construction's proposal to raze existing structures at 33-35 Hollis Street and construct three single-family condominiums, driveways, decks, and a stormwater management system within 100 feet of bordering vegetated wetlands. Engineer Doug Lee's of Land Engineering and Environmental Services described a net increase of roughly 3,000 square feet of impervious surface offset by grass swales, a riprap forebay, and six roof recharge units across the three buildings. Key conditions require an undisturbed vegetated buffer between an existing berm and the wetland edge, incorporation of the erosion control plan onto the grading plan before the conservation agent signs the order, and invasive-species-free loam. The commission also voted unanimously to issue a certificate of compliance for a lapsed 2007 order of conditions — DEP File No. 259-705 — under which no work was ever started.

Keep reading with a 14-day free trial

Subscribe to The Pepperell MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Pepperell MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Reading Post · The Sherborn Post · The Shirley Post · The Somerville Post · The Stoneham Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.